Skip to content

White frame vs green frame: what the developer must hand over

· 2 min read

Most new apartments in Georgia are sold and handed over as a shell: not a finished home, but not bare concrete either. The two terms you’ll meet most often are white frame and green frame. They’re widely used, but they aren’t defined by law, so what they include depends on your developer and your contract.

Black frame, briefly

A black frame is the most basic state: the structure, external walls and usually the windows, with little or nothing inside. It’s less common for apartments sold to private buyers.

White frame

A white frame usually means the apartment is ready for finishing work. Typically it includes:

What it usually doesn’t include: final finishes, flooring, tiling, sanitary fittings, kitchen, interior doors.

Green frame

The term is used less consistently. Many developers use it for a state between black and white frame, for example with some partitions and rough work done, but not the full white frame. Others use it differently. Read your contract: it should list exactly what you get.

Why it matters at handover

An inspection checks two things:

  1. Is everything the contract promises actually there? For example, the plaster, screed, wiring and connection points.
  2. Is it built properly? For example, whether the walls are plumb, the screed level, the windows sealed, the sockets live.

A shell that looks finished can still have walls out of plumb, damp in the corners or a floor area smaller than the contract. These are much cheaper to fix before you renovate and cover everything up.

Before you sign


We check the shell, white or green frame, against your contract and report within 24 hours.

Want an engineer to check yours?