CriticalD-01
Balcony door doesn't seal
Living room, balcony door, top corner
Thermal image: frame edge 6 °C colder than the frame
An engineer checks your new apartment before handover. You get a photo report within 24 hours, and the developer pays to fix what we find.
Inspections from 200 ₾
BinaScan is an independent inspection company. We don't work for developers, agents or brokers on handovers, and we take no commission from them.
The contract states an area; the walls decide the real one. Every missing square metre is money you have already paid.
Damp behind fresh plaster, hairline cracks, windows that leak in the first storm. You need tools to find them, not a good eye.
Once the handover act is signed, getting the developer to fix anything is slower and much harder. Before you sign, it's their job.
Whole apartment, net floor area. Example figures. Your report shows your apartment, room by room.
Most new apartments in Georgia are handed over as a shell, white frame or green frame, so we check the shell: what's built, not the finishes.
Laser-measured, room by room, against the contract.
Plumb, flat and square, within tolerance.
Located, measured and photographed.
Meter readings in walls, floors and corners.
Frames, glazing, seals, opening and closing.
Every socket and circuit we can test.
Water pressure, drains and visible pipework.
Airflow in the kitchen and bathroom ducts.
Cold bridges and hidden leaks, on camera.
Entrance, stairs, lift and the facade near you.
Four stops, from booking to a fixed apartment.
Today
Choose a package and a date. Send us the contract area and the project name.
Inspection day
An engineer spends 45 minutes to 2 hours in the apartment. Join us, or watch by video from anywhere.
Within 24 hours
Every defect photographed and rated, the area against the contract, and a letter for the developer.
After repairs
When the developer says it's fixed, we come back and check that it is.
Every defect photographed, located and rated, with the measured area against the contract. This is a page from our sample report.
BinaScan · Inspection report
Example project, Batumi · Apartment 14, 9th floor · White frame
Example
CriticalD-01
Living room, balcony door, top corner
Thermal image: frame edge 6 °C colder than the frame
MediumD-05
Bedroom 2, wall by the window
0 V at the socket; others in the room 230 V
CosmeticD-10
Hall, above the door frame
0.2 mm wide, 35 cm long
One visit, a fixed price, a report within 24 hours. Prices per apartment, in Georgian lari.
A quick check of the area and the obvious
Recommended
The full inspection most buyers need
Everything, and you don't have to be there
Re‑check
After the developer's repairs · ~40 min on site
120 ₾≈ $50
Book: Re‑checkRenovation acceptance
Before you pay your contractor · ~90 min on site
350 ₾≈ $140
Book: Renovation acceptanceBuilding group
5 or more apartments in one building, same day
−20%
Ask for a quote: Building group50% deposit when booking, the rest when the report is delivered. Clients abroad pay 100% in advance by card or bank transfer.
We're your eyes on site, so you don't have to fly in for the handover.
A friend's opinion helps. It's hard to send to a developer.
| Why not ask a friend who knows construction? | A friend who knows construction | BinaScan |
|---|---|---|
| A written report with photos of every defect | Usually not | Within 24 hours |
| Floor area measured against the contract | Rarely, with a tape | Laser, every room |
| Moisture meter and thermal camera | Rarely | Moisture always; thermal in Premium |
| A letter to the developer | No | Ready to send |
| Independent from the developer | Depends on the friend | We never work for developers on handovers |
| A re-check after repairs | If they have time | Included in Premium, or 120 ₾ |
About 45 minutes for Basic and up to 2 hours for Premium, depending on the size of the apartment.
Yes, and we recommend it. You'll see each defect as we find it. If you can't be there, we stream or record the walkthrough.
Ask the developer in writing for an inspection appointment before handover, and don't sign the handover act until it has happened. We can help you word the request. A refusal is worth knowing about before you sign.
Not on handovers. We work only for buyers, so nothing stops us from reporting what we find.
You send our letter to the developer, they fix the defects, and we come back to check the fixes. The re-check is included in Premium.
Yes. The renovation acceptance package checks a contractor's finished work, ideally before you pay the final invoice.
By card or bank transfer, 100% in advance. We send the payment details when we confirm your booking.
No. It's a visual and instrument-based inspection with a documented report, not a structural engineering survey and not a court expert's opinion. If your case needs a formal expert opinion, we'll tell you.
As soon as the developer gives you a handover date. Ideally the inspection is a few days before you sign, so there's time to send the letter and get an answer.
Your contract, for the area and the specification, and access to the apartment. If electricity and water are connected, we can test them too.